專業(yè)術(shù)語中英文名稱對照表
《專業(yè)術(shù)語中英文名稱對照表》由會(huì)員分享,可在線閱讀,更多相關(guān)《專業(yè)術(shù)語中英文名稱對照表(377頁珍藏版)》請?jiān)谘b配圖網(wǎng)上搜索。
1、序號中英文對照表AABC:Activity-Based CostingAccuracyAddition ruleADM:Absolute Dimension MeasurematAnalysis CovarianceANOVA:Analysis of VarianceAppraisal VariationASQCAttributeAutomatic database recoveryBalance sheetBinomialBrainstorming TechniquesBSC:Balanced ScoredoardBTF:Build To ForecastBTO:Build To Order
2、Business Systems PlanningCause and Effect matrixCettificate of conformityChi-square DistributionClutch springCoiningCompound factorCondenserConformityConfidence intervalControl characteristicCorrelation MethodsCPM:Complaint per MillionCPI:continuouse Process ImprovementCreepCRM:Customer Relationship
3、 ManagementCRP:Capacity Requirements PlanningCross Tabulation TablesCTO:Configuration To OrderCTQ:Critical to qualityCushionData concentratorDefects per unitDesign of manufacturingDeviceDFSS:Design for six sigmaDOE:Design of ExperimentsDOF:Design of manufacturingDPMO:Defects per million opportunitie
4、sDPM:Defects per millionDPU:Defects per unitDSA:Defects Analysis SystemDSS:Decision Support SystemDVT:Design Verification TestingEC:Electronic CommerceECO:Engineering Change OrderECR:Engineering Change RequestElementEngineering recbnologyEntropyEMC:Electric Magnetic CapabilityEOQ:Economic Order Quan
5、tityERP:Enterprise Resource PlanningEstimated accumulative frequencyEV:Equipment VariationEVT:Engineering Verification TestingExternal FailureFact controlFAI:First art inspectionFatiqueFirst sample test reportFMS:Flexible Manufacture SystemFPY:first process yieldFQA:Final Quality AssuranceFQC:Final
6、Quality controlFull-steerGGauge systemGage R&R:Gage repeatability&reproducibilityGum-rollHHealth meterHeat pressHistogramHi-techhypergeometricHypothesis testinghysteresisInductanceInitial reviewISO:International Organization for StandardizationIS:Inspection SpecificationISAR:Initial Sample Approval
7、RequestKKM:Knowledge ManagementLLaw of large numberLCL:Lower Control limitLQC:Line Quality ControlLQL:Limiting Quality LevelLPCL:Lower Per-control LimitLSL:Lower Size LimitMedianMES:Manufacturing Execution SystemMiss feedMO:Manufacture OrderModule,sub-system,sub-unitMomentumMonte garlo methodMPS:Mas
8、ter Production ScheduleRMA:Return Material AuditMRB:Material Reject BillMRB:Material Review BoardMRP:Manufacturing Resource PlanningMRO:Maintenance Repair OperationMRP:Material require planningMultiplication ruleNNFCF:Notice for Changing ForecastNISTNormal distributionODM:Original Design&Manufacture
9、OEM:Original Equipment ManufactureOperation InstructionOPT:Optimized Production TechnologyOQC:Out-going Quality ControlPartoParty informationPassivePCL:Per-control central limitPCN:Process Change NoticePDCA:Plan Do Check ActionPlan reviewPMP:Product Management PlanPulsePO:Purchase OrderPQA:Process Q
10、uality AssurancePrecisionpreemptiveSales catalogueProbability density functionProcess capability analysisProcess control and process capabilityProcess data reportProducers riskProduct performance reportProduct specification reportPS:Package SpecificationPVT:Process Verification TestingQAN:Quality Am
11、elionrate NoticeQFD:Quality Function DesginQI:Quality ImprovementQIT:Quality Improvement TeamQuality manualRRandom experimentReflowRepeatusilityReproducibilityResidualRMA:Returned Material ApprovalRobustnessRolled yieldROP:Re-Order PointRPN:Risk Priority NumberSample spaceSampling stdSampling with r
12、eplacementSampling without peplacementScatter diagramSCM:Supply Chain ManagementScrapScrewSeveritySFC:Shop Floor ControlShot-peeningSimple random samplingSIP:Specification In ProcessSIP:Standard Inspection ProcedureSL:Size LineStratified random samplingSOP:Standard Operation ProcedureSOR:Special Ord
13、er RequestSPC:Statistical Process ControlStage samplingStandard DeviationSum of squaressystematic samplingStatistical tablesTTaguchi-methodTechnical committeesTime stampTime-lagTOC:Theory of ConstraintsTorqueTPM:Total Production ManagementTransaction processing and loggingUPCL:Upper Per-control Limi
14、tUSL:Upper Specification LimitUCL:Upper control limitVValidationVariableVarianceVectorVerification of ca/paVOE:Voice of EngineerWWIP:Work In Process6:Six Sigma7QCTools:7 Quality Controll Tools s:Standard deviation2,S2:Variance作業(yè)制成本制度準(zhǔn)確度加法運(yùn)算規(guī)則全尺寸測量協(xié)方差分析方差分析/變異數(shù)分析評價(jià)變差美國質(zhì)量學(xué)會(huì)計(jì)數(shù)值數(shù)據(jù)庫錯(cuò)誤自動(dòng)回復(fù)資產(chǎn)負(fù)債對照表二項(xiàng)分配腦力風(fēng)暴法
15、平衡計(jì)分卡計(jì)劃生產(chǎn)訂單生產(chǎn)企業(yè)系統(tǒng)規(guī)劃因果圖.魚骨圖一致性證書卡方分布離合器彈簧壓印加工調(diào)合因素聚光鏡合格信賴區(qū)間中英文對照表管制特性相關(guān)分析法每一百萬個(gè)使用者會(huì)有幾次抱怨連續(xù)工序改善漸變客戶關(guān)係管理產(chǎn)能需求規(guī)劃交叉表客製化生產(chǎn)品質(zhì)關(guān)鍵緩沖資料集中緩存器單位缺點(diǎn)數(shù)製造設(shè)計(jì)裝置六個(gè)希格瑪設(shè)計(jì)實(shí)驗(yàn)設(shè)計(jì)製造設(shè)計(jì)每百萬個(gè)機(jī)會(huì)的缺點(diǎn)數(shù)每百萬單位的缺點(diǎn)數(shù)單位缺點(diǎn)數(shù)缺陷分析系統(tǒng)決策支援系統(tǒng)設(shè)計(jì)驗(yàn)證電子商務(wù)工程改動(dòng)要求工程變更請求元素工程技術(shù)函數(shù)電磁相容基本經(jīng)濟(jì)訂購量企業(yè)資源規(guī)劃計(jì)算估計(jì)累計(jì)數(shù)設(shè)備變異工程驗(yàn)證外部失效,外部缺陷事實(shí)管理首樣檢查疲勞首樣測試報(bào)告彈性製造系統(tǒng)合格率(直通率)最終品質(zhì)保證最終品質(zhì)控制
16、完全轉(zhuǎn)向量測系統(tǒng)量具重複能力與重製能力(再現(xiàn)性與再生性橡皮滾筒體重計(jì)沖壓粘著直方圖高科技超幾何分配假設(shè)檢定磁滯現(xiàn)象電感先期審查國際標(biāo)準(zhǔn)組織檢驗(yàn)規(guī)范首批樣品認(rèn)可知識(shí)管理大數(shù)法則管制下限生產(chǎn)線品質(zhì)控制最低品質(zhì)水準(zhǔn)前置管制下限規(guī)格下限中位數(shù)製造執(zhí)行系統(tǒng)漏送製令單位原動(dòng)力原子核分裂熱運(yùn)動(dòng)法主生產(chǎn)排程退料認(rèn)可退貨單物料評審會(huì)議製造資源計(jì)劃請修(購)單物料需求規(guī)劃乘法運(yùn)算規(guī)則更改預(yù)估量的通知美國:標(biāo)準(zhǔn)技術(shù)院常態(tài)分布委託設(shè)計(jì)與製造委託代工作業(yè)指導(dǎo)書最佳生產(chǎn)技術(shù)出貨品質(zhì)控制柏拉圖參與方信息消極的,被動(dòng)的前置管制中心限工序改動(dòng)通知計(jì)劃 執(zhí)行 檢查 對策計(jì)劃確認(rèn)生產(chǎn)管制計(jì)劃脈沖訂單制程品質(zhì)保證精密度先占式多任務(wù)銷
17、售目錄機(jī)率密度函數(shù)制程能力分析圖制程管制與制程能力工藝數(shù)據(jù)報(bào)告生產(chǎn)者之風(fēng)險(xiǎn)產(chǎn)品性能報(bào)告產(chǎn)品規(guī)格型號報(bào)告包裝規(guī)范制程驗(yàn)證品質(zhì)改善活動(dòng)品質(zhì)機(jī)能展開品質(zhì)改善品質(zhì)改善小組品質(zhì)手冊隨機(jī)試驗(yàn)回流再現(xiàn)性再生性誤差退貨驗(yàn)收穩(wěn)健性直通率再訂購點(diǎn)風(fēng)險(xiǎn)系數(shù)樣本空間抽樣水準(zhǔn)放回抽樣不放回抽樣散布圖分析供應(yīng)鏈管理報(bào)廢螺旋嚴(yán)重度現(xiàn)場控制微粒沖擊平面法簡單隨機(jī)取樣制程檢驗(yàn)規(guī)格標(biāo)準(zhǔn)檢檢作業(yè)書規(guī)格中心線分層隨機(jī)抽樣標(biāo)準(zhǔn)作業(yè)書特殊訂單需求統(tǒng)計(jì)制程管制分段隨機(jī)抽樣標(biāo)準(zhǔn)差統(tǒng)計(jì)表系統(tǒng),體系系統(tǒng)抽樣田口方法技術(shù)委員會(huì)時(shí)間戳印延遲限制理論轉(zhuǎn)矩全面生產(chǎn)管理交易處理前置管制上限規(guī)格上限管制上限確認(rèn)計(jì)量值變異和向量糾正/預(yù)防措施驗(yàn)證工程需求在製
18、品六個(gè)希格瑪品管七大手法標(biāo)準(zhǔn)差變異數(shù)常用英文對照表S/N生產(chǎn)注意事項(xiàng)varistorphoto couple光藕合二極體petES電氣規(guī)格lock washerPK電路圖bridge diodePD外觀尺寸圖VR(variable)PM零件符號圖chip resistorH-PCB連片圖ceramic capacitancePI銅箔面布線圖Fuse holderregulation調(diào)整NTCFN(factory notice)生產(chǎn)通知spring washerimmediately change立即變更star washerrunning change自然切換diode(dio)bobbin線
19、軸transistorscrew螺絲control boardspace supportlr塑膠柱regulatorviolet紫色filterdisposition處置heat sinkover voltage protection過電壓保護(hù)insulatorover current protection過電流保護(hù)resistor(res)over power protection過功率保護(hù)capacitorzener齊納chokeripple漣波inductornoise buzz異音switchfan no turn風(fēng)扇不轉(zhuǎn)casemax load最大負(fù)載socketleakage cu
20、rrem漏電流nutsolder錫washerpallet棧板housingswitch power supply開關(guān)電源供應(yīng)器terminalhi-pot高壓rivetreted額定的tubelid蓋子epoxypi bat塑膠袋jumper wirepad紙板solder bardryer干燥劑pre-formingpi film保護(hù)膜fluxpartition隔板insertiongrounding接地solder machinepu foam海棉gravityEPS保力龍touch-upremote遙控的ADDfixture治具fun loadoscillographhi-pot te
21、stquality manualoperation instructoralteration refprocedurepolarity reversedmissing partno lead protrudedimproper insertioncomponent shiftedinsulation damagedpoor preformingsolder voidexcessive soldernear shortsolder cracksolder spattersolder bridgecold soldersolder iciclesolder shortsolder in suffi
22、cientmissing soldermissing markinglead protrusion out of specmissing gluesolder mask peeling offcontaminationNDTlower caseupper casefuseselect switch突破吸收器場效電晶體接地星形墊片橋片整流可變電阻晶片電阻陶瓷電容保險(xiǎn)絲座熱敏電阻彈簧墊片星形墊片二極體電晶體小基板穩(wěn)壓器濾波器散熱片絕緣片電阻電容線圈電感開關(guān)外殼插座螺帽墊片罩框端子卯釘套管樹脂跳線錫棒加工成型助焊劑插件錫燼比重補(bǔ)焊增加滿載示波器高壓測試品質(zhì)手冊工作指導(dǎo)書變更依據(jù)作業(yè)程序極性反漏件無線
23、尾裝插不良零件偏移絕緣不良成型不良錫洞錫多近似短路錫裂錫渣錫橋冷焊錫尖短路錫少漏焊漏標(biāo)示線腳長漏點(diǎn)膠防焊漆膠落污損誤判外殼下蓋外殼上蓋保險(xiǎn)絲選擇開關(guān)一一、織織機(jī)機(jī)構(gòu)構(gòu)及及職職位位XX Electronics CO.,LtdXX電子有限公司General managers office總經(jīng)理辦公室Enterprise management department(EM)企管部Administration department(AD)行政部Sales department(SD)銷售部Financial department(FD)財(cái)務(wù)部Technology department(TD)技術(shù)部Pro
24、duction material control department(PMC)物控部Production department(PD)生產(chǎn)部Mold manufacturing department,Toolingmanufacturing department 模具部Quality Assurance department(QA)品管部Stamp workshop,press workshop 沖壓車間injection workshop注塑車間Assembly workshop裝配車間Mold and die Assembly workshop模具裝配車間Metal machine wo
25、rkshop金屬加工車間Electric discharge process workshop電脈沖車間wire cutting process workshop線切割車間Grinding workshop工磨車間General manager(GM)總經(jīng)理Vice-general manager/Vice president副總經(jīng)理manager經(jīng)理president董事長Vice-president副董事長Manager of XX departmentXX部門經(jīng)理supervisor/director主任、主管Line leader拉長Foreman,forelady組長secretar
26、y秘書clerk文員operator操作員assistant助理staff職員二二、產(chǎn)產(chǎn)品品三三、模模具具connector連接器mould of plasticsterminal端子injection mouldbar connector條型連接器dieHousing陰連接器mould basewafer陽連接器Top clamping platewire harness線束Top platespace間距Fixed clamp platerated voltage額定電壓stripper platerated current額定電流A platecontact resistance接觸電阻
27、B plateinsulation resistance 絕緣電阻support plateultrasonic welding超聲波焊接spacer platewithstand voltage耐壓ejector platepin針ejector retainer platepart number物料編號Return pinwire導(dǎo)線Guide pinBase metal基體金屬Shoulder Guide bushcable clamp電纜夾Straight Guide bushchamfer倒角Bottom clamp platecontact area接觸面積Moving clamp
28、 platecontact cavity接觸件安裝孔datum linecontact length接觸長度datum plancontact plating接觸件電鍍層core-retainer platecontact pressure接觸壓力punch-retainer platecontact space接觸件中心距ejector pincontact spring接觸簧片single cavity mouldsocket contact插孔multi-cavity mouldFlange法蘭、凸緣multi-gatinginterfacial gap界面間隙gateKey鍵starv
29、ingkeyway鍵槽breathingramp過渡段glossshielding屏蔽套mould clamping forceDatum reference定位基準(zhǔn)mould locking forceflat cable ,Ribboncable扁平電纜extrusionFlexible printedwiring柔性印刷電線crackMultilayer printedcircuit多層印制電路cycle timepad焊盤agingpattern圖形screwpitch間距pitNegative pole負(fù)極insertpositive pole正極movable insertRefl
30、ow回流chalkingSchematic diagram原理圖feed systemsingle sided board 單面板sprueTwo-sidedboard,Double-sidedboard雙面板runnersurface Mounting表面安裝gatewarp,bow翹曲direct gate ,spruegatewave soldering波峰焊spoke gate ,spidergatebraid編織層pin-point gatecoaxial cable同軸電纜edge gatedielectric電介質(zhì)submarine gate,tunnelgateends電纜中導(dǎo)
31、線的頭數(shù)cold-slug wellexternal interference 外部干擾sprue bushfiller填充物runner platejacket護(hù)套ventspecific gravity比重parting lineTemperaturecoefficient ofresistance電阻的溫度系數(shù)stationarymould,F(xiàn)ixed mouldmovable mould,movablehalfupper mould,upperhalflower mould,lowerhalfcavitycavity plate,cavityblocksplitdoweldowel h
32、olecoreangle pin,finger camslideslide guide stripheel block,wedge locksprue pullerlocating ringcooling channeldraftslide corethreaded corehot-runner mouldinsulated runner mouldweld line(flow line)three plate mouldejectioninterchangeable cavitymouldrelease agentshot capacityinjection rateinjection pr
33、essurecolorantholdup timeclosing timesizing systemfemale mould,cavityblockmale mouldElectron DischargeMachiningCNC machine centerUniversal millingmachineHorizontal planerEngine latheSurface grindingmachineDemagnetizationmachineUniversal radialmovable drillerVertical drillerUltrasonic clearingmachine
34、四四、品品管管塑料模具statistic process control統(tǒng)計(jì)制程控制注塑模具Quality Assurance品管保證沖壓模具Quality control品管控制模架IQC Incoming quality control來料檢驗(yàn)定模座板IPQC In-process quality control巡檢頂板calibration校對固定板dynamic test動(dòng)態(tài)試驗(yàn)水口推板Environmental test環(huán)境試驗(yàn)A板non-destructive test非破壞性試驗(yàn)B板gloss光澤支承板(dielectric)breakdown voltage擊穿電壓方鐵tens
35、ile strength拉伸強(qiáng)度底針板thermal shock test冷熱驟變試驗(yàn)面針板Environmental chamber環(huán)境試驗(yàn)爐回針salt spray test鹽霧實(shí)驗(yàn)導(dǎo)柱Insulating resistance meter絕緣電阻測試驗(yàn)儀有托導(dǎo)套internal stress內(nèi)應(yīng)力直導(dǎo)套fatigue疲勞底模座板creep蠕變動(dòng)模座板specimen試樣基準(zhǔn)線tear strength撕裂強(qiáng)度基準(zhǔn)面shrink mark,sink mark縮痕型芯固定板durability耐久性三三、模模具具凸模固定板sampling抽樣頂針sample size樣品數(shù)量單腔模具AQL
36、Acceptable Quality level允收品質(zhì)水準(zhǔn)多腔模具lot size批量多澆口sampling plan抽樣計(jì)劃澆口operation curveOC曲線缺料sequence of tests試驗(yàn)順序排氣ambient temperature環(huán)境溫度光澤solderability可焊性合模力flame resistance阻燃性鎖模力Japanese Industrial Standard Z2902日本工業(yè)標(biāo)準(zhǔn)Z2902擠出Acceptable Quality Level允收水準(zhǔn)開裂Probability Of Acceptable允收機(jī)率循環(huán)時(shí)間Defective不良品老化
37、Percent Defective不良率螺桿Average Outgoing Quality平均出廠品質(zhì)麻點(diǎn)Average Outgoing Quality Curve平均出廠品質(zhì)曲線嵌件Average Outgoing Quality Limit平均出廠品質(zhì)界限活動(dòng)鑲件Average Sample Number平均抽樣件數(shù)起堊Average Sample Curve平均抽樣曲線澆注系統(tǒng)Average Total Inspection平均總檢驗(yàn)數(shù)主流道Average Total Inspection Curve 平均總檢驗(yàn)曲線分流道Major Defective主要不良品澆口Major Def
38、ect主要缺點(diǎn)直澆口Minor Defective次要不良品輪輻澆口Minor Defect次要缺點(diǎn)點(diǎn)澆口Producters Risk生產(chǎn)者冒險(xiǎn)率:測澆口Customers Risk消費(fèi)者冒險(xiǎn)率潛伏澆口Relivery Inspection出廠檢驗(yàn):料穴Population群體:澆口套Defects Per Hundred Units百件缺點(diǎn)數(shù)流道板Acceptance Value合格判定值:排飛槽Acceptance Number合格判定數(shù):分型線(面)Range全距:定模Total Inspection全數(shù)檢驗(yàn):動(dòng)模Partrol Inspection巡迴檢驗(yàn):上模Lot Size批量:
39、下模Systematic Sampling系統(tǒng)抽樣:型腔Operation Characteristic Curve作業(yè)特性曲線凹模Rejection Number拒收數(shù):拼塊Reject拒收:定位銷Probability Of Rejection拒收機(jī)率定位銷孔Sampling抽樣:型芯Inspection Of Variable計(jì)量值檢驗(yàn):斜銷Inspection Of Attribute計(jì)數(shù)值檢驗(yàn):滑塊Quality Inprovement Index品質(zhì)改善指數(shù)滑塊導(dǎo)板Relative Frequency相對次數(shù):楔緊塊Quality Index品質(zhì)指數(shù):拉料桿Contionuous
40、Distribution連續(xù)分配:定位環(huán)Sampling Plan For ContinuousProduction連續(xù)生產(chǎn)型抽樣檢驗(yàn):冷卻通Normal Distribution常態(tài)分配:脫模斜度Single Sampling Inspection單次抽樣檢驗(yàn):滑動(dòng)型芯Receiving Inspection進(jìn)料檢驗(yàn):螺紋型芯Final Inspection最終檢驗(yàn):熱流道模具Single Specification Limit單邊規(guī)格界限:絕熱流道模Process Inspection制程檢驗(yàn):熔合紋Probability Distribution機(jī)率分配:三板式模具Standard No
41、rmal Distribution標(biāo)準(zhǔn)常態(tài)分配:脫模Distribution分配:換模腔模具Screening Sampling Inspection選別型抽樣檢驗(yàn):脫模劑Random Sampling隨機(jī)抽樣:注射能力Random隨機(jī):注射速率Double Sampling Inspection雙次抽樣檢驗(yàn):注射壓力Double Specification Limil雙邊規(guī)格界限:差色劑Sample Random Sampling簡單隨機(jī)抽樣:保壓時(shí)間閉模時(shí)間定型裝置陰模陽模電加工設(shè)備數(shù)控加工中心萬能鐵床臥式刨床車床平面磨床去磁機(jī)萬能搖臂鉆床立式鉆床超聲波清洗機(jī)五五、生生產(chǎn)產(chǎn)六六物物控控in
42、jection machine注塑機(jī)shelf lifePunch machine沖床ABC Classification blender mixer混料機(jī)Abnormal Demand nylon尼龍Action Message brass黃銅Action-report-flag bronze青銅Activity-based Costing(ABC)copper紫(純)銅Actual Capacity hopper料斗Actual Costspit麻點(diǎn)Adjust-on-hand compounding配料Allocation coating涂層Alternative Routineflas
43、h飛邊Assembly Order preheating預(yù)熱Assembly Parts List reworked material再生料Assembly reworked plastics再生塑料Automatic Rescheduling process design工藝設(shè)計(jì)Available Inventory emergency stop緊急停止Available Material time delay延時(shí)Available Stock Available Work Available-to-promise Average Inventory Back Order Back Sche
44、duling Back flush Backlog Balance-on-hand Inventory Batch Number Batch Production Benchmarking Bill of Labor Bill of Lading Bill of Material Branch Warehouse Business Plan Buyer Capacity Management Capacity RequirementsPlanning(CRP)Carrying Cost Rate Carrying Cost Cellular Manufacturing Change Lot D
45、ate Change Route Change Structure Check Point Closed Loop MRP Common Route ID Computer-integratedManufacturing(CIM)Configuration CodeConstraintsManagement/Theory ofConstraints(TOC)Costed Bill of MaterialCritical Part Cumulative Lead Time Current Run Hour Current Run Quantity Cycle Counting Adjust Da
46、te Available Date Changed Date Closed Date Due Date Produced DateInventory Adjust Date Obsolete Date Received Date Released Date Required Date shipping dateDead Load Demand Management Demand Demonstrated Capacity Dependent Demand Direct-deduct InventoryTransaction Processing Disbursement List Dispat
47、ch ListDistribution ResourcePlanning(DRP)Drum-buffer-rope Economic Order Quantity(EOQ)Engineering Change EffectDate Engineering Change EffectWork Order Engineering Stop DateException Control Excess Material AnalysisExpedite Code Fabrication Order Fill Backorder Final Assembly Lead TimeFirm Planned O
48、rder Fixed Order Quantity Focus ForecastingFull Pegging Generally AcceptedManufacturing Practices Gross Requirements In Process Inventory Independent Demand Input/Output Control Inspection ID Interplant Demand Inventory Carry Rate Inventory Location Type Inventory Turnover Issue Order Item RecordIte
49、mJob ShopJust-in-time(JIT)Kanban Labor Hour Last Shipment DateLead TimeLevel Load Leveling Load Report Load Location Code Location Remarks Location Status Lot for Lot Lot ID Lot Number Lot Size Low Level Code Machine Capacity Machine Loading Make or Buy Decision Make-to-order Product Make-to-stock P
50、roduct Manufacturing Cycle Time Manufacturing ResourcePlanning(MRP II)Master Production Schedule(MPS)Material Cost Material Issues and ReceiptsMaterial RequirementsPlanning(MRP)MPS Book Flag MPS Multiple Location MRP N et Change MRP Net Requirements New Location New Parent New Warehouse No Action Re
51、port On-hand Balance Open Order Order Entry Order Point Order Policy Order Promising Order Remarks Parent Part Bills Part Lot Part Number Part Pegging Picking List Picking Planned Order Post-deduct InventoryTransaction Processing Pre-deduct InventoryTransaction Processing Price Invoice Price Purchas
52、e Order Priority Planning Product Control Production Line Production Planning Production Rate Production Tree Projected Available Balance Purchase Order Tracking Quantity Allocation Quantity At Location Quantity Backorder Quantity Completion Quantity Demand Quantity Gross Quantity In Queue Time Queu
53、e MRP Regenerated MRP Rescheduling Assumption Resource RequirementsPlanning Rough-cut Capacity Planning Routing Safety Stock Safety Time Scheduled Receipt Scrap Factor Send Part Service Parts Ship Address Ship Contact Ship Date Ship Order Shop Calendar Shop Floor Control Shrinkage Factor Standard Pr
54、oduct Cost Standard Set Up Hour Standard Unit Run HourStandard Wage Rate Status Code Stores Control Suggested Work Order Theory of Constraints(TOC)Time Bucket Time Fence Unit Cost Vendor Scheduler Vendor Scheduling Work Center Capacity Work Center Work in Process Work Order Tracking Work Order Work
55、Scheduling Zero Inventories APICS,American Production&Inventory Control Society七七QS-9000中中的的術(shù)術(shù)語語保質(zhì)期APQP Advanced Product Quality Planning and Control PlanABC分類法PPAP Production Part Approval Process反常需求FMEA Potential Failure Mode and Effects Analysis措施信息MSA Measure System Analysis活動(dòng)報(bào)告標(biāo)志SPC Statistica
56、l Process Control基于活動(dòng)的成本核算Audit 實(shí)際能力Capability實(shí)際成本Capability Indices調(diào)整現(xiàn)有庫存量Control Plans已分配量Corrective Action替代工序Documentation裝配訂單Job Instruction,work instruction裝配零件表Nonconformance裝配Nonconformity計(jì)劃自動(dòng)重排Defective Parts Per Million,DPPM可達(dá)到庫存Preventive Action可用材料Procedures達(dá)到庫存Process Flow Diagram,Proce
57、ss Flow Chart可利用工時(shí)Quality Manual可簽約量Quality Plan平均庫存Quality Planning欠交訂單Quality Records倒序計(jì)劃Raw Data六六物物控控倒沖法Reaction Plan未完成訂單Repair現(xiàn)有庫存余額Rework批號Site批量生產(chǎn)Subcontractors 標(biāo)桿瞄準(zhǔn)product工時(shí)清單quality提貨單quality requirement物料清單customer satisfaction分庫quality management system經(jīng)營規(guī)劃quality policy采購員quality object
58、ive能力管理quality management能力需求計(jì)劃quality control保管費(fèi)率quality assurance保管費(fèi)organization單元式制造customer修改批量日期supplier修改工序process修改產(chǎn)品結(jié)構(gòu)service檢查點(diǎn)design and development閉環(huán)物料需求計(jì)劃characteristic通用工序標(biāo)識(shí)trace ability計(jì)算機(jī)集成制造conformity配置代碼defect約束管理/約束理論correction依成本的材料清單concession急需零件release累計(jì)提前期scrap現(xiàn)有運(yùn)轉(zhuǎn)時(shí)間specificat
59、ion現(xiàn)有運(yùn)轉(zhuǎn)數(shù)量inspection周期盤點(diǎn)test調(diào)整日期verification有效日期review 修改日期measurement結(jié)束日期Attributes Data截止日期Common Cause生產(chǎn)日期Individual庫存調(diào)整日期Mean作廢日期Random Sampling收到日期Range交付日期Special Cause需求日期Stability發(fā)貨日期Subgroup空負(fù)荷Variables Data需求管理Variation需求Design Verification實(shí)際能力Voice of the Customer非獨(dú)立需求Inherent Variation直接增
60、減庫存處理法Total Variation發(fā)料單Bias派工單Repeatability分銷資源計(jì)劃Reproducibility鼓緩沖繩子Stability經(jīng)濟(jì)訂貨批量Linearity工程變更生效日期Resolution工程變更生效單Process change工程停止日期QFD例外控制Special Process Characteristic呆滯材料分析Special Product Characteristic急送代碼Appearance Item加工訂單Preliminary Process Capability補(bǔ)足欠交Bill of Material總裝提前期Design Val
61、idation確認(rèn)的計(jì)劃訂單固定訂貨批量集中預(yù)測完全跟蹤通用生產(chǎn)管理原則毛需求在制品庫存獨(dú)立需求投入/產(chǎn)出控制檢驗(yàn)標(biāo)識(shí)廠際需求庫存周轉(zhuǎn)率倉庫庫位類型庫存周轉(zhuǎn)次數(shù)發(fā)送訂單項(xiàng)目記錄物料項(xiàng)目加工車間準(zhǔn)時(shí)制生產(chǎn)看板人工工時(shí)最后運(yùn)輸日期提前期層負(fù)荷量負(fù)荷報(bào)告負(fù)荷倉位代碼倉位備注倉位狀況按需訂貨批量標(biāo)識(shí)批量編號批量低位碼機(jī)器能力機(jī)器加載外購或自制決策面向訂單生產(chǎn)的產(chǎn)品面向庫存生產(chǎn)的產(chǎn)品制造周期時(shí)間制造資源計(jì)劃主生產(chǎn)計(jì)劃物料成本物料發(fā)送和接收物料需求計(jì)劃登陸標(biāo)志多重倉位凈改變式凈需求新倉位新組件新倉庫不活動(dòng)報(bào)告現(xiàn)有庫存量未結(jié)訂單訂單輸入訂貨點(diǎn)訂貨方針訂貨承諾訂貨備注雙親零件清單零件批次零件編號零件反查領(lǐng)料單
62、領(lǐng)料/提貨計(jì)劃訂單后減庫存處理法前減庫存處理法發(fā)票價(jià)格采購訂單價(jià)格優(yōu)先計(jì)劃產(chǎn)品控制產(chǎn)品線生產(chǎn)規(guī)劃編制產(chǎn)品率產(chǎn)品結(jié)構(gòu)樹預(yù)計(jì)可用庫存采購訂單跟蹤已分配量倉位數(shù)量欠交數(shù)量完成數(shù)量需求量毛需求量進(jìn)貨數(shù)量排隊(duì)時(shí)間隊(duì)列重生成式重排假設(shè)資源需求計(jì)劃粗能力計(jì)劃工藝路線安全庫存量保險(xiǎn)期預(yù)計(jì)入庫量殘料率發(fā)送零件維修件發(fā)貨地址發(fā)貨單聯(lián)系人發(fā)貨零件發(fā)貨單工廠日歷車間作業(yè)管理損耗系數(shù)標(biāo)準(zhǔn)產(chǎn)品成本標(biāo)準(zhǔn)機(jī)器設(shè)置工時(shí)標(biāo)準(zhǔn)單位運(yùn)轉(zhuǎn)工時(shí)標(biāo)準(zhǔn)工資率狀況代碼庫存控制建議工作單約束理論時(shí)間段時(shí)界單位成本采購計(jì)劃員采購計(jì)劃法工作中心能力工作中心在制品工作令跟蹤工作令工作進(jìn)度安排零庫存美國生產(chǎn)和庫存控制協(xié)會(huì)八八常常用用縮縮略略詞詞語語產(chǎn)品
63、質(zhì)量先期策劃和控制計(jì)劃Engineering Specification生產(chǎn)件批準(zhǔn)程序Key Control Characteristic潛在失效模式及后果分析Key Product Characteristic測量系統(tǒng)分析Original Equipment Manufacturer統(tǒng)計(jì)過程控制Significant(Special)Characteristic審核 Analysis of Variance能力 Cross function Team能力指數(shù) Design Failure Mode and Effects Analysis控制計(jì)劃 Design of Experiment糾正
64、措施 Design verification Plan and Report文件 First Time Capability作業(yè)指導(dǎo)書 Gage Repeatability and Reproducibility不合格品 Process Failure Mode and Effect Analysis不合格 System Failure Mode and Effect Analysis每百萬零件不合格數(shù) Quality System Requirement預(yù)防措施 Quality Function Deployment程序 Things Gone Right過程流程圖 Things Gone
65、Wrong質(zhì)量手冊Value Engineering/Value Analysis質(zhì)量計(jì)劃 Bill of Material質(zhì)量策劃 Capability for stable process質(zhì)量記錄Lower Control Limit原始數(shù)據(jù)Upper Control Limit反應(yīng)計(jì)劃Lower Specification Limit返修Upper Specification Limit返工The performance index現(xiàn)場Material Review Board分承包方Part Submission Warrant產(chǎn)品Average-Range Chart質(zhì)量Suppli
66、er Request for Product Change質(zhì)量要求Supplier Request for Engineering Approval顧客滿意Interim Approval Authorization 質(zhì)量管理體系A(chǔ)ppearance Approval Report質(zhì)量方針Production Trial Run(Report)質(zhì)量目標(biāo)Dimension Control Plan(Dynamic Control Plan)質(zhì)量管理Mistake Proofing質(zhì)量控制質(zhì)量保證組織顧客供方過程服務(wù)設(shè)計(jì)與開發(fā)特性可追溯性合格缺陷糾正讓步放行報(bào)廢規(guī)范檢驗(yàn)試驗(yàn)驗(yàn)證評審測量計(jì)數(shù)型數(shù)據(jù)普通原因單值均值隨機(jī)抽樣極差特殊原因穩(wěn)定性子組計(jì)量型數(shù)據(jù)變差設(shè)計(jì)驗(yàn)證顧客的呼聲固有變差總變差偏倚重復(fù)性再現(xiàn)性穩(wěn)定性線性分辨率過程更改質(zhì)量功能展開過程特殊特性產(chǎn)品特殊特性外觀項(xiàng)目初始過程能力材料清單設(shè)計(jì)確認(rèn)九九.NormalNormal1、ES 工程規(guī)范 5S2、KCC 關(guān)鍵控制特性ABC3、KPC 關(guān)鍵產(chǎn)品特性ABB4、OEM 整車廠 ABM5、SC重要(特殊)特性 APS6、ANOVA 方差分析法
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 市教育局冬季運(yùn)動(dòng)會(huì)安全工作預(yù)案
- 2024年秋季《思想道德與法治》大作業(yè)及答案3套試卷
- 2024年教師年度考核表個(gè)人工作總結(jié)(可編輯)
- 2024年xx村兩委涉案資金退還保證書
- 2024年憲法宣傳周活動(dòng)總結(jié)+在機(jī)關(guān)“弘揚(yáng)憲法精神推動(dòng)發(fā)改工作高質(zhì)量發(fā)展”專題宣講報(bào)告會(huì)上的講話
- 2024年XX村合作社年報(bào)總結(jié)
- 2024-2025年秋季第一學(xué)期初中歷史上冊教研組工作總結(jié)
- 2024年小學(xué)高級教師年終工作總結(jié)匯報(bào)
- 2024-2025年秋季第一學(xué)期初中物理上冊教研組工作總結(jié)
- 2024年xx鎮(zhèn)交通年度總結(jié)
- 2024-2025年秋季第一學(xué)期小學(xué)語文教師工作總結(jié)
- 2024年XX村陳規(guī)陋習(xí)整治報(bào)告
- 2025年學(xué)校元旦迎新盛典活動(dòng)策劃方案
- 2024年學(xué)校周邊安全隱患自查報(bào)告
- 2024年XX鎮(zhèn)農(nóng)村規(guī)劃管控述職報(bào)告